University of North Texas – Indoor Practice Facility
The 94,000SF indoor practice facility at North Texas is currently under construction. The facility boosts a 130 yard field allowing the north end zone to be worked from both directions.
The 94,000SF indoor practice facility at North Texas is currently under construction. The facility boosts a 130 yard field allowing the north end zone to be worked from both directions.
The 8,100SF, $4.5M locker room renovation delivers Georgia Tech’s standard of technology, excellence, and innovation.
The Athletic Master Plan provides a proactive long-term plan to locate the athletic facilities within the campus with a primary focus on a new football operations facility and subsequent backfill of the Murphy Center.
$16.5m and only 14 months to convert the Turner Field MLB ballpark into a collegiate football stadium and home of Georgia State Athletics.
Lead Designer Project Architect Heery’s sports facility design group designed a new 4,000-seat football stadium for the Colorado School of Mines. The $15.2 million project includes a general seating grandstand with restrooms, concessions, press box and VIP area; a 48,000 SF Athletic Facility with strength and conditioning, training, hydrotherapy, equipment, meeting rooms, auditorium, football and … Read more
Lead Sports Designer Heery Sports teamed with a local firm to design the new indoor football practice facility and renovate the football team facility for the University of Memphis. The new practice facility connects to the existing team facility and adds a new multi purpose dinning/academic facility and coaches offices that overlook the new indoor … Read more
The 189,000 SF, $72m addition, houses a state of the art football ops facility and connects both sides of the stadium with a lower bowl, mid-level concourse and upper luxury club in the North end zone.